B&K 2250 Light Manuale Utente Pagina 25

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 24
CHAPTER 3
Making Your First Measurement
17
3.3.2 Switching On
Switch the analyzer on by pressing . The start-up time depends on the state the analyzer was
in when last switched off and it may take up to 2 minutes from a cold start, or up to 10 seconds
if the instrument is already in Standby Mode (that is, from a warm start).
Note: A cold start is a re-boot of the analyzer from ROM. This normally occurs after the
analyzer has been turned off for some time, either by the user or following an automatic power-
down. A warm start takes the analyzer quickly from Standby mode to fully operational without
having to re-boot. (The battery needs to be charged for this to happen, see section 2.5.1.)
3.3.3 Set the Sound Level Meter Project Template
After initialization, the screen shown in Fig.3.1 appears:
Fig.3.1
Initial sound level meter
screen
1) Check that the SOUND LEVEL METER project template is displayed at the top of the
screen, see Fig.3.1. If not, use the stylus to tap on the bar at the top of the screen to reveal
a drop-down list and select SOUND LEVEL METER from the list (Fig.3.2).
Vedere la pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 211 212

Commenti su questo manuale

Nessun commento